Skip to content
Oracle AI World 2026October 25–28 The Venetian, Las Vegas

For OTM customers and implementation partners

Keep your freight systems. Connect your network.

Moving every business onto OTM is a big undertaking. We’re building Commonline to connect load and equipment data from the systems you already use, so OTM can plan across the network.

Free assessment + sample validation for our first partner.

Working demo today. Acceptance by a real OTM system still needs validation.

The idea we’re testing

From local systems
to network planning.

  1. 01

    Your freight systems

    Load and equipment data.

  2. 02

    Commonline

    Translate data. Review unclear values.

  3. 03

    OTM

    Plan, optimize and execute.

Vision shown. The first test covers agreed loads; network-wide capacity delivery is not yet proven.

See what works today

Free for one partner

Your first connection, tested.

Get an assessment, a test of agreed loads in your OTM test instance, and written results. You keep the findings whether or not we move forward.

What you get

  • A map of which data goes where.
  • Unanswered questions, with owners.
  • A report of OTM results and records Commonline held.
Discuss your first connection

Who it’s for

OTM customers: connect an acquired business or operating unit that runs another freight system.

Implementation partners: bring a client whose freight data sits outside OTM.

In return, we ask for agreed access, review time and—if the test meets the agreed criteria—a reference and short case study with your approval.

What participation involves
  • One source system, with an authorized sample export or read-only access.
  • An OTM test instance and an administrator who can check the results.
  • People who can answer data questions and approve mappings. Plan for roughly 12–16 hours of your team’s time over about four weeks; scope and access determine the schedule.

Scope, effort and terms are agreed in writing before work starts. You approve all public wording. Not sure you have everything? Start with what you do have.

How it works

Commonline translates the data. Your team resolves unclear meanings. In the partner test, your OTM administrator checks what was accepted.

See how unclear data is handled
  1. Read the agreed source data and apply mappings your team approves.
  2. Hold affected records when codes or units are unclear. Ask a person before proceeding.
  3. Track what was prepared, held or left out, then check acceptance in OTM.

The optional AI mapping assistant is off by default. Your team reviews and approves its suggestions.

What’s ready today

Built and tested today

  • Working screens for mapping loads, reviewing questions and following each record, tested with simulated systems.
  • OTM messages tested against a simulated endpoint; limited McLeod Track & Trace sandbox reads.
  • Designed to run in your environment. Installation, access and security checks are agreed with your team.

What the partner test checks

  • A real OTM tenant connection. None has been connected yet.
  • Your source's field coverage, code meanings and exception decisions.
  • Business acceptance of the agreed sample, checked by your OTM administrator.

See it in action

01 / THE TOUR

The 1:16 product tour

Follow a load issue from discovery to review. Narrated, with English captions.

Actual product. Simulated source data. Mock OTM.

Transcript + desktop tour
Play the tour · 1:16

Let's meet at Oracle AI World

Meet Ruk at AI World

Spend twenty minutes on the systems you run and one connection worth testing. No access or sample needed to meet.

Meet Ruk at AI World

Opens your email app. Suggest a time and tell us which systems you use.

Ruk Dias · Co-founder, CommonlineProduct and engineering lead, with a background in cloud applications and integrations. At the show to discuss your first connection.